Modification of Existing Electrical Installation to Meet Client Specification
One Way was appointed as principal electrical contractor to modify the electrical installation to the former Remploy Building. We worked closely with Stairbox Senior Management to
upgrade and meet the requirements of the client’s expansion project within a short time frame. The project involved the expansion of the LV Panel to meet the requirements of the new dustraction system and additional manufacturing plant. The installation of high level ladder containment to facilitate the distribution of supply cables to the woodworking equipment throughout the production area. The design and installation of new lighting under a new mezzanine floor area in the goods outward department. The connection of all dustraction panels, motors and associated controls. The modification of lighting and power circuits to meet new business needs.
FULL DESIGN AND INSTALLATION OF ELECTRICAL POWER SUPPLIES TO PRODUCTION LINE WOODWORKING MACHINERY.
Call 01782 595 600 for more information or visit us online www.onewayelectrical.co.uk
STAIRBOX IS LOCATED IN TRENTHAM LAKES, STOKE ON TRENT. THE MODERN 25,000 SQ FT STAIRCASE FACTORY BOASTS THE VERY LATEST IN TECHNOLOGY FOR STAIRCASE MANUFACTURING.
IT WAS IMPERATIVE THAT THE ELECTRICAL INSTALLATION WAS READY TO ACCOMMODATE OUR MOVE IN DATE. ONE WAY ELECTRICAL ROSE TO THE CHALLENGE BOTH IN TERMS OF TIME FRAME AND QUALITY OF WORK. THEY WERE HIGHLY PROFESSIONAL WHILST WORKING ALONGSIDE OTHER TRADES AND IN THEIR MANNER TOWARDS STAFF MEMBERS. WE HAVE BEEN DELIGHTED WITH THEIR ASSISTANCE IN ENSURING THE SUCCESS OF OUR RELOCATION AND EXPANSION.
Andrew Hancock
Director
Call 01782 595 600 for more information on this Project