Greater Manchester
Power Distribution
Greater Manchester
Power Distribution
One Way was appointed to deliver the full upgrade and relocation of an ageing Motor Control Centre (MCC) at a Suez Recycling Energy from Waste (EFW) site. The existing MCC was situated in a remote external lean-to building and had reached the end of its serviceable life, with corrosion making continued operation unreliable and unsafe.
Working in partnership with IES Works, One Way designed and installed a replacement MCC, which was relocated to the main site control room for improved access, operability, and protection. The project required significant pre-planning and coordination due to fixed shutdown windows and complex integration with the existing SCADA system and infrastructure.
Despite space constraints, scaffolded working areas, and a tight commissioning schedule, the MCC was built, installed, tested, and fully commissioned within the programme—ensuring minimal disruption to plant operations.